1. When the bottom plates at the head and tail of the belt conveyor are soft, the cement foundation with a length of 2m, a width of 1.5m and a depth of 1m shall be used for fixation, and the foot bolts (Φ 20mm) shall be embedded in the cement foundation no less than 700mm. When the bottom plate at the head and tail of the machine is firm, the ground anchor shall be used for fixation (the anchoring force shall not be less than 50kN), and the ground anchor bolt (Φ 20mm) shall be cast with cement and embedded in the bottom plate not less than 1400mm.
 
2. It is necessary to make sure that the head and tail of the equipment belt conveyor are fixed firmly and run smoothly. The distance between the bottom belt and the bottom plate shall not be less than 400mm, and the distance between the low point of tail roller and the bottom plate shall not be less than 150mm. The test run of the equipment should be flat, straight and stable, and the center of the nose, fuselage and tail should be in a straight line.
 
3. It is necessary to set the protective gate at the head and tail of the machine to avoid the contact between the personnel and the driving roller and the guide roller, and install the iron grate at the coal unloading bin (the interval size is 250mm × 250mm).
 
4. It is necessary to leave a safety gap for the belt conveyor. The distance between the belt conveyor and the roadway support shall not be less than 0.5m; the distance between the head and tail of the belt conveyor and the roadway support shall not be less than 0.7m.
 
5. The head frame, tail frame, tension equipment and protective equipment shall be free of open welding and deformation. The fixed bolts shall be fastened, the thread shall be exposed for 1-3 threads, and the conditioning allowance of tension equipment shall not be less than 1 / 5 of the whole conditioning stroke. The center frame is straight without open welding, the lifting rope (the upper lifting width should be greater than the lower width), and the frame is intact, fixed firmly without severe corrosion.
 
6. Double strand No.8 iron wire is selected for wire rope hanging. The lower end of the hanging point is set on the long roller frame, and the upper end is fixed on the fixed point of the roof. The double strand iron wire is evenly stressed, and the wire rope end is tightly bound.
 
7. The roller is complete, flexible and free from jamming. The distance of each group of triple idler is 1.5m, the distance of each long idler is 3M, the distance of anti deviation idler is 15m, and the small distance between bottom idler and bottom plate shall not be less than 200mm.
 
8. The lap length of belt conveyor shall not be less than 0.5m. When the belt conveyor is used to transport coal upward, the inclination angle shall not be greater than 18 degrees, and when the belt conveyor is used to transport coal downward, the inclination angle shall not be greater than 15 degrees.
 
9. The belt maintenance equipment such as slipping, coal stacking, speed, smoke, over temperature, deviation, emergency stop, tearing, watering and anti reversal shall be complete and flexible, and the signal equipment shall be sound and light, clear and reliable; when more than two belt conveyors are running online, the interlocking equipment shall be flexible and reliable. The skid maintenance equipment is on the non pedestrian side of the belt head automatic roller; the deviation maintenance equipment is on the belt hanger, 25m away from the leather head; the coal stacking maintenance equipment is on the belt head; the emergency stop maintenance equipment is 30m away from the belt head at the top of the beam; the belt tearing maintenance equipment is 30m away from the leather head below the belt; the over temperature maintenance equipment is on the gearbox; the smoke maintenance equipment is directly above the belt head. The water spray and dust suppression equipment is installed on the head transfer point, the nozzle is from the head belt 0.5m, the control valve is positioned in an open direction, and the height is 1.5m from the bottom plate.
 
10. The motor, gearbox and coupling are firmly connected, and the protective cover is completely reliable. The roller is not cracked and the key is not loose.
 
11. The width of the damaged surface of the central fiber layer shall not exceed 20% of the width. The connector clip is firm and flat. During operation, the belt does not slip and deviate, the upper and lower belt does not exceed the edge of the roller and idler, and the lower belt does not grind the frame.


主站蜘蛛池模板: 妖精视频免费网站| 一级免费毛片| 交换韩国电影| 国产粉嫩嫩00在线正在播放| 扒开女人内裤边吃奶边摸| 欧美妇乱xxxxx视频| 日本三级理论| 在线看福利影| 91精品国产高清久久久久| 秋霞日韩一区二区三区在线观看| 动漫乱人伦视频在线观看| 波多野结衣视频全集| 好吊妞最新视频免费观看| 伊人a.v在线| 美女的大胸又黄又www又爽| 波多野结衣不打码视频| 草草影院ccyy国产日本欧美| 国产精品高清一区二区三区 | 色综合天天综合网国产成人网| 山口珠理番号| 三级很黄很黄的视频| 亚洲中字慕日产2020| 韩国三级女电影完整版| 久久精品国产久精国产| 精品无人区一区二区三区| 五月婷婷深爱| 韩国护士hd高清xxxx| 亚洲视频免费看| 99在线精品免费视频| 18男同少爷ktv飞机视频| 亚洲精品美女在线观看播放| 欧美性猛交xxxx乱大交| 日本口工里番| 一级毛片视频在线| 韩国免费一级片| 中文字幕一区精品| 国产精品电影久久久久电影网| 优优里番acg※里番acg绅士黑| 攵女yin乱合集高h文| 最近2018中文字幕2019国语视频| 91久久精品国产91久久性色也|